Wind turbines need wind. Not just any wind, but the nicely flowing, smooth, laminar kind. That cannot be found at 30 feet height. It can usually not be found at 60 feet. Sometimes you find it at 80 feet. More often than not it takes 100 feet of tower to get there. Those towers cost as much or more, installed, as the turbine itself. How much tower you need for a wind turbine to live up to its potential depends on your particular site; on the trees and structures around it etc. Close to the ground the wind is turbulent, and makes a poor fuel for a small wind turbine.
Green-e is a voluntary certification program for renewable electricity products. The Green-e program establishes consumer protection and environmental standards for electricity products, and verifies that these products meet the standards. The Green-e logo certifies that at least half the power supplied is from renewable sources. Many products will carry the Green-e logo, and the best way to find the most environmentally sensitive providers is by doing some comparison research. To find out which Green-e certified products are available in your state, visit Green-e's electric choices page. Questions about particular providers can be directed to the Center for Resources Solutions, which administers the Green-e program, at (415) 561-2100.
“Trump’s Keystone XL Tar Sands Oil Pipeline Promise, Unkept and Undone” • The federal judge for the District of Montana who overturned permit for the Keystone XL pipeline issued an order that all but guarantees the project will die another death by a thousand cuts. He ordered a complete do-over on economic and environmental impacts. [CleanTechnica]

By participating in a green energy program a consumer may be having an effect on the energy sources used and ultimately might be helping to promote and expand the use of green energy. They are also making a statement to policy makers that they are willing to pay a price premium to support renewable energy. Green energy consumers either obligate the utility companies to increase the amount of green energy that they purchase from the pool (so decreasing the amount of non-green energy they purchase), or directly fund the green energy through a green power provider. If insufficient green energy sources are available, the utility must develop new ones or contract with a third party energy supplier to provide green energy, causing more to be built. However, there is no way the consumer can check whether or not the electricity bought is "green" or otherwise.
The electrical machine most commonly used for wind turbines applications are those acting as generators, with synchronous generators and induction generators (as shown) being commonly used in larger wind turbine generators, while smaller and home made wind turbines tend to use a low speed DC generator or Dynamo as they are small, cheap and a lot easier to connect up.
For either photovoltaic or thermal systems, one option is to loft them into space, particularly Geosynchronous orbit. To be competitive with Earth-based solar power systems, the specific mass (kg/kW) times the cost to loft mass plus the cost of the parts needs to be $2400 or less. I.e., for a parts cost plus rectenna of $1100/kW, the product of the $/kg and kg/kW must be $1300/kW or less.[190] Thus for 6.5 kg/kW, the transport cost cannot exceed $200/kg. While that will require a 100 to one reduction, SpaceX is targeting a ten to one reduction, Reaction Engines may make a 100 to one reduction possible.

Many industrialized nations have installed significant solar power capacity into their grids to supplement or provide an alternative to conventional energy sources while an increasing number of less developed nations have turned to solar to reduce dependence on expensive imported fuels (see solar power by country). Long distance transmission allows remote renewable energy resources to displace fossil fuel consumption. Solar power plants use one of two technologies:
×